1. Trang chủ
  2. Dự án
  3. SONG TRANH 4 HYDROPOWER PLANT

SONG TRANH 4 HYDROPOWER PLANT

  • Installed Capacity: 48 MW
  • Average Annual Generation: 178 GWh
  • Location: Hiep Duc, Viet An, Lanh Ngoc, Phuoc Tra – Da Nang City
  • Completion: September 2021